Facts and Figures
 
The Dragon LNG Terminal facilities will
consist of:
An Liquefied natural gas
unloading jetty
Liquefied natural gas
storage tanks
Liquefied natural gas
gasification and gas export
The terminal will have the following basic
operating parameters:
365 days per year continuous operation.
Receive and unload 71,000 to 165000m3
cubic metre capacity Dragon LNG carriers
in approximately 24 hours.
The average and maximum natural
gas send-out rate to the NTS pipeline of 700,000 cubic metres
per hour respectively.
The Dragon LNG terminal facilities
are designed, engineered and constructed to assure safety, environmental
compliance, reliability, quality, efficient manpower utilization,
operability and maintainability.
The Dragon LNG terminal will use
commercially proven technology, equipment and materials which
have successfully demonstrated performance in similar operating
conditions at various installations throughout the world.
|