Dragonlng Energy for Wales
 
 

What is Dragon LNG?

space

• What will it look like?

space

Project Partners
BG Group
Petronas
4Gas

space

Project participants
Whessoe Oil & Gas Ltd
Volker Stevin Construction Europe bv
M.W. Kellogg Ltd

space

Facts and Figures

space

Health, Safety and Security

10 Golden Rules of Construction at Dragon LNG
space
LNG Carriers

space

Company History

space

Dragon LNG latest news
space
Dragon LNG construction update
space
 

Facts and Figures

The Dragon LNG Terminal facilities will consist of:

• An LNG unloading jetty

LNG storage tanks

LNG gasification and gas export

The terminal will have the following basic operating parameters:

• 365 days per year continuous operation.

• Receive and unload 71,000 to 165000m3 cubic metre capacity LNG carriers in approximately 24 hours.

• The average and maximum natural gas send-out rate to the NTS pipeline of 700,000 cubic metres per hour respectively.

• The Dragon LNG terminal facilities are designed, engineered and constructed to assure safety, environmental compliance, reliability, quality, efficient manpower utilization, operability and maintainability.

• The Dragon LNG terminal will use commercially proven technology, equipment and materials which have successfully demonstrated performance in similar operating conditions at various installations throughout the world.