Dragon’s liquefied natural gas terminal consists of: a jetty, storage tanks and regasification facilities combined with gas export capabilities for 365 days per year continuous operation.
Our terminal has the capacity to receive and unload up to 217,000 cubic metre capacity carriers in approximately 24 hours and has a maximum gas send out rate to the NTS of 1,200,000 standard cubic metres per hour.
Designed, engineered and constructed to the highest specification to assure safety, environmental compliance, reliability, quality, our terminal operates at the highest levels of efficiency using commercially proven technology, equipment and materials.