Dragon LNG Terminal

Our terminal was designed, engineered and constructed to the highest specification to ensure safety, environmental compliance, reliability and quality.  It operates at the highest levels of efficiency using commercially proven technology, equipment and materials.

Receiving its first LNG cargo on 14th July 2009, Dragon’s terminal consists of a jetty, storage tanks and regasification facilities, combined with gas export capabilities for 365* days per year, continuous operation and a maximum gas send out rate to the UK’s National Transmission System (NTS) of 7.6 billion cubic metres of gas per annum (bcma).

The terminal meets peak gas demands, providing clean and reliable energy for millions of commercial and residential UK users.

*less planned and unplanned maintenance